1. The problem statement, all variables and given/known data
To be able to break cement, the hammer of a machine needs to have a mass of 1.00 x 10² kg.
The motor of the machine lifts it at a height of 5.00 meters every 10.0 seconds.
To be able to break cement, the hammer of a machine needs to have a mass of 1.00 x 10² kg.
The motor of the machine lifts it at a height of 5.00 meters every 10.0 seconds.
a) How much work did the machine realize within 1.00 minute?
2. Relevant equations
W = Fd
1 min = 60s/1min
3. The attempt at a solution
Work = 100 kg * 5.00 m = 500 J
60 seconds * 500 J = 30000 J
Is that how its done? I’m pretty confused.